Definitions for the construction and ERP terms used across ORKSTRA. Each term is shown in English and Arabic.


A

Advance paymentدفعة مقدمة A pre-payment from the client at contract start, typically 10-20% of contract value. Recovered through deductions on each IPC.

Aging reportتقرير أعمار الذمم A report showing how long receivables or payables have been outstanding, bucketed (0-30, 31-60, 61-90, 90+ days).

Approval workflowمسار الموافقات A defined sequence of decision steps a request must pass through before becoming effective.

As-built drawingمخططات تنفيذية The final version of a drawing reflecting what was actually constructed, vs. what was originally designed.

Asset registerسجل الأصول The list of all equipment, plant, and tools owned or operated by the firm.

Audit logسجل التدقيق Immutable record of every state change in the system.

B

Backchargeخصم مقابل A deduction applied to a subcontractor's payment for work the main contractor had to redo.

Baselineالخط الأساسي The locked-in plan (cost, schedule, scope) against which actual performance is measured.

BOQ — Bill of Quantitiesجدول الكميات The priced quantity list of work to be performed.

Bondخطاب ضمان A bank guarantee (performance bond, advance payment bond, retention bond).

Build-to-suitالبناء حسب الطلب A construction model where the building is custom-designed for a single tenant.

C

Calibrationمعايرة Periodic accuracy verification of measurement instruments.

Cash flow forecastتوقع التدفق النقدي Projection of cash receipts and disbursements over a forward period.

CPI — Cost Performance Indexمؤشر أداء التكلفة Earned Value ÷ Actual Cost. >1 means under budget.

Cumulative quantityالكمية التراكمية Total quantity claimed to date across all IPCs.

D

Defects liability period (DLP)فترة ضمان العيوب Post-handover period during which the contractor remains responsible for fixing defects (typically 12 months).

Delay analysisتحليل التأخير Methodology used to attribute project delays to specific causes / parties.

Deliverableمخرَج A tangible output a contract requires (drawings, reports, certificates).

Disciplineتخصص A category of work (architectural, structural, MEP, civil, etc.).

DMS — Document Management Systemنظام إدارة الوثائق Controlled storage and distribution of project documents.

E

EAC — Estimate at Completionتقدير عند الإنجاز Forecast total cost based on current performance.

Earned valueالقيمة المكتسبة The budgeted value of work actually completed.

EmaraTaxإماراتاكس UAE Federal Tax Authority's online portal for VAT and corporate tax submissions.

EOT — Extension of Timeتمديد الفترة Approved time extension to the contract period, typically due to client-caused delays.

EPC — Engineering, Procurement, Constructionالهندسة والتوريد والإنشاء Contracting model where a single firm handles design, procurement, and execution.

EPD — Environmental Product Declarationإقرار بيئي للمنتج Standardized document describing a product's environmental impact.

EVM — Earned Value Managementإدارة القيمة المكتسبة Project performance measurement methodology.

F

FIDICالفيديك International Federation of Consulting Engineers; publisher of widely-used construction contract templates.

Final accountالحساب الختامي The post-completion reconciliation of all costs, variations, and claims.

G

GDRFAالإدارة العامة للإقامة وشؤون الأجانب UAE General Directorate of Residency and Foreigners Affairs.

Geotechnical reportتقرير الجيوتقني Soil and ground conditions analysis.

GRN — Goods Received Noteإشعار استلام Receipt event when material physically arrives on site.

H

Handoverتسليم The act of transferring a completed work package to the client.

Hijriهجري Islamic lunar calendar used in much of the GCC.

Hot workالأعمال الساخنة Welding, cutting, grinding — work that creates sparks or heat. Requires a hot work permit.

HSE — Health, Safety & Environmentالصحة والسلامة والبيئة Workplace safety and environmental management.

I

ICAالهيئة الاتحادية للهوية والجنسية UAE Federal Authority for Identity, Citizenship, Customs & Port Security.

Idempotencyالجمود الفعلي Property where repeating an operation yields the same result.

IPC — Interim Payment Certificateشهادة دفع مرحلية Monthly progress payment certified by the engineer.

Issueإصدار Material handed from store to site, against a BOQ activity.

ITP — Inspection & Test Planخطة الفحص والاختبار Pre-defined sequence of inspections for a specific activity.

J

JSA — Job Safety Analysisتحليل سلامة العمل Structured hazard identification document for a specific task.

K

KPI — Key Performance Indicatorمؤشر أداء رئيسي A measurable value that demonstrates how effectively objectives are achieved.

L

LD — Liquidated Damagesالغرامات التأخيرية Pre-agreed monetary deduction for each day of contractor-caused delay.

LEEDليد Leadership in Energy and Environmental Design — green building certification.

Lienحجز Legal claim against property for unpaid debt.

Linear meterمتر طولي Standard unit for linear measurement of pipes, ducts, edges.

LTI — Lost Time Injuryإصابة فقدان الوقت Workplace injury causing absence beyond the day of injury.

LTIFR — Lost Time Injury Frequency Rateمعدل تكرار إصابات الوقت المفقود LTIs per million man-hours worked.

M

Manhourساعة عمل One hour of one person's work; the unit for HSE statistics.

Method statementبيان الطريقة Document describing how a specific construction activity will be performed safely.

Milestoneحدث رئيسي A contractually significant date (substantial completion, taking over).

MOH — Materials on Siteمواد في الموقع Materials delivered but not yet installed. Claimable at a discounted rate.

MoHREوزارة الموارد البشرية والتوطين UAE Ministry of Human Resources and Emiratisation.

MTC — Medical Treatment Caseحالة علاج طبي Injury requiring medical treatment beyond first aid.

N

NCR — Non-Conformance Reportتقرير عدم المطابقة Formal record of work that does not meet specification.

Near missحادث وشيك An incident that didn't result in injury but could have.

O

OAuth 2.0أوث 2.0 Industry-standard authorization framework.

Omissionحذف A subtraction from contract scope, usually via variation order.

ORKSTRAاوركسترا The brand name of the platform.

P

P&O — Profit & Overheadالربح والمصاريف العامة The markup applied to direct cost in pricing.

PDPLقانون حماية البيانات UAE Personal Data Protection Law.

Permit to workتصريح عمل Authorization to perform specific high-risk work in a controlled manner.

PKCEPKCE Proof Key for Code Exchange — secure OAuth flow for public clients.

Plantمعدات Heavy construction equipment.

Pre-qualification (PQ)التأهيل المسبق Client's process of vetting contractors before issuing tender invitations.

Punch listقائمة العيوب List of remaining defects at handover.

Q

QA — Quality Assuranceضمان الجودة Processes that prevent defects.

QC — Quality Controlمراقبة الجودة Processes that detect defects.

QS — Quantity Surveyorمساح الكميات Cost professional specialized in quantification and pricing.

QTO — Quantity Takeoffحصر الكميات Process of measuring quantities from drawings.

R

RBAC — Role-Based Access Controlالتحكم بالوصول حسب الدور Permission model based on assigned roles.

Re-baselineإعادة تأسيس Locking a new baseline after major scope changes.

Retentionمحتجزات Percentage withheld from each IPC (typically 5-10%) released at completion / DLP end.

RFI — Request for Informationطلب معلومات Formal query from contractor to consultant about a design clarification.

S

SAML 2.0ساما 2.0 Security Assertion Markup Language — federated identity protocol.

SCIMSCIM System for Cross-domain Identity Management — provisioning protocol.

Scope 1 / 2 / 3نطاق 1 / 2 / 3 GHG Protocol categorization — direct / purchased energy / value chain emissions.

SIFSIF Salary Information File — format MoHRE accepts for WPS.

SLA — Service Level Agreementاتفاقية مستوى الخدمة Commitment on response time, uptime, etc.

SOC 2SOC 2 Audit standard for service organization controls.

Soft deleteحذف لين Marking a record deleted in UI while preserving in database.

SPI — Schedule Performance Indexمؤشر أداء الجدول الزمني Earned Value ÷ Planned Value. >1 means ahead of schedule.

SSO — Single Sign-Onتسجيل دخول موحد One login that gives access to multiple applications.

Substantial completionالإنجاز الجوهري Stage at which work is sufficiently complete for the client to use it.

T

Tenderمناقصة Formal invitation to bid; the process of competing for contract award.

Time impact analysisتحليل تأثير الوقت Methodology for quantifying schedule impact of a variation or claim.

Toolbox talkاجتماع السلامة اليومي Short pre-shift safety briefing.

TRIR — Total Recordable Incident Rateمعدل الحوادث الإجمالي Recordable incidents per 200,000 man-hours.

U

Unit rateسعر الوحدة Price per unit of measure in the BOQ.

V

VAT — Value-Added Taxضريبة القيمة المضافة 5% in UAE, 15% in KSA.

VDC — Virtual Design & Constructionالتصميم والإنشاء الافتراضي Use of BIM and digital tools for pre-construction planning.

VO — Variation Orderأمر تغيير Formal change to contract scope, cost, or time.

W

WBS — Work Breakdown Structureهيكل تجزئة العمل Hierarchical decomposition of project work.

Webhookويب هوك HTTP callback delivered on a specific event.

Witness pointنقطة شاهد Inspection point that requires the client / consultant to be present.

Working at heightالعمل في المرتفعات Work where falling is possible — requires specific permit and PPE.

WPS — Wage Protection Systemنظام حماية الأجور UAE federal mechanism ensuring workers are paid through bank channels.